SYSPRO Factory Scheduling

Objective
The SYSPRO Factory Scheduling products give you the ability to schedule the production in your factory to a detailed
level considering the capacity constraints in your environment. You have the option of three products, ranging
from the simple Graphical Planning Board to the very sophisticated Advanced Scheduler; the latter being classified
as an APS (Advanced Planning and Scheduling) system.
The Value of SYSPRO Factory Scheduling
- Develop feasible production schedules considering resource availability, constraints, shift patterns etc.
- Provide insight into the progress of specific jobs
- Highlight jobs that will be late and allow focus on these jobs
- Provide insight into the expected utilization of resources for managing shift patterns and scheduled mainteance accordingly
- Provide accurate delivery dates to customers (especially in a make-to-order environment)
- Close the loop of communication between sales people, schedulers and the production floor
- Achieve the right balance between flexible setup and simplicity
- Eliminate duplication of data entry/maintenance; the routing and bills of material as setup in SYSPRO WIP module is used for scheduling